
New Sewer System for Peaceful Valley Camp
Planning and design of a recirculating filter wastewater treatment and collection system to serve a camp that operates year round in Ste. Genevieve County. The system is designed for 2,400 gallons per day and includes a 4,800 gallon septic tank, a 2,400 gallon recirculating tank, a 30’x32’ filter bed, and 6” gravity collection sewer.