
Village of Boulder Creek (Meier Lake Retirement Village)
Client: Kahle, Mike
Civil Engineering
Planning and design of a recirculating filter wastewater treatment and collection system to serve a 24-unit retirement community in Cape Girardeau County. The system is designed for 2,400 gallons per day and includes a 2,400 gallon recirculating tank, a 30’x32’ filter bed, and variable grade septic tank effluent gravity collection sewer.